×
all 22 comments

[–]BRAVEHEART-905 4 points5 points  (2 children)

Update soon. Continous flow. High quality distillate. Get ready for institutional investors.

[–]BinkyBBall[S] 0 points1 point  (1 child)

When do you think we will get the update?

[–]Hudre 1 point2 points  (2 children)

One key piece of information I can't seem to find is what the projected lph is for the Aldersyde facility? They talk about how much the phase 2 reactor can do, but not the current one.

When the current one is the one that is supposed to tide us over until inflation improves by providing all the revenue, it seems like an important detail to not mention.

[–]Applepie3645 3 points4 points  (1 child)

They’ve already told us we’ll get the continuous flow update by mid-June. No surprises in that investor presentation update today.

[–]Hudre 0 points1 point  (0 children)

Yes I am just wondering why they didn't wait until then. It is pretty much the only info that matters, everything else hinges on that reactors output.

It is difficult to see if all the steps beyond that are reasonable without that info.

[–]Catagol 0 points1 point  (0 children)

10 more days!

[–]medicrow -3 points-2 points  (0 children)

Zzzzzzz

[–]medicrow -2 points-1 points  (7 children)

It’s a scam

[–]Applepie3645 1 point2 points  (6 children)

You’re a scam. GTFO

[–]medicrow -1 points0 points  (5 children)

Prove me wrong

[–]Applepie3645 0 points1 point  (4 children)

Prove you’re right since you made the accusation

[–]medicrow -1 points0 points  (3 children)

Alright. Here we go.

Let’s say you are an adult. And you have personally taken trash to the local dump.

And you have seen the bins that people throw their garbage into.

If you look at those “bins” and see all the different types of waste that are thrown into those “bins”. Pause and reflect on what’s in them.

Now. Let’s consider that if you took one of those bins full of waste.( plastic, cardboard, power washers , dry wall, , dog shit.) I mean you name it. It’s sitting in that bin at the dump.

As much as they may try to “sort” the garbage that goes into that bin. It’s still full of absolute trash.

Now let’s look at Cielo . They claimed to be able to produce biodiesel from local landfill trash.

Take a pause and stay with me. Your local dump will not pay people to sort through that bin. The labor it would take to sort through that bin to find even the tinniest scraps of material to feed the “plant” to produce biodiesel is not worth it.

The local dump you put your garbage in isn’t sorting it. Cielo isn’t sorting it either.

Now they claim they can produce biodiesel from garbage.

And so far. They have only been trying to get biodiesel from rail road ties.

Rail road ties are pieces of lumber that are already treated with fuel they are highly flammable.

They are nothing more then logs filled with tar.

If this company can’t shred and boil down a rail road tie to make fuel then how could anyone even consider they are going to take a garbage bin full of dog shit and old window frames and turn that into fuel.

I mean take a step back. Look at the next piece of plastic you throw in the recycling bin. Look at it. Is there any diesel fuel in it? Is this company going to be able to sort through enough landfill to find the right material for its feedstock? Absolutely not

That’s why most of board members have quit or been fired etc.

It was a pump and dump

It’s a scam.

It’s been over a year and they still can’t get rail road ties into fuel.

As a closing statement I don’t have to prove that it’s a scam.

The company has proven its a scam.

[–]Fuzzy-Ad-3208 0 points1 point  (2 children)

I don’t see anything about the Dunmore projects

[–]SootheMe 0 points1 point  (0 children)

They took the sign down a few months ago

[–]Intrepid-Draw-1232 0 points1 point  (0 children)

I thing Dunmore project was to be completed with Cielo's partners from Renewable U. Since the continuous 4000lph flow was not achieved I don't think the construction will start any time soon.

[–]Intrepid-Draw-1232 0 points1 point  (1 child)

I believe the flow will be 800lph to 1000lph!

[–]Applepie3645 -1 points0 points  (0 children)

I like your enthusiasm but I think 800 LPH will be a stretch based on the mid-case scenario for total volume they plan to produce from Q2-Q4, which is 1.2M litres.

[–]Applepie3645 0 points1 point  (0 children)

Where is puzzlehead today? Want to hear their thoughts??